{"id":356,"date":"2004-06-25T17:07:08","date_gmt":"2004-06-25T17:07:08","guid":{"rendered":"http:\/\/www.brucedale.net\/?p=356"},"modified":"2013-12-27T17:24:05","modified_gmt":"2013-12-27T17:24:05","slug":"dalia-fpso-angola","status":"publish","type":"post","link":"https:\/\/www.brucedale.net\/?p=356","title":{"rendered":"Dalia FPSO, Angola."},"content":{"rendered":"<p><a href=\"http:\/\/www.brucedale.net\/?attachment_id=452\" rel=\"attachment wp-att-452\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.brucedale.net\/wp-content\/uploads\/2004\/06\/fpso_dalia.png\" alt=\"fpso_dalia\" width=\"640\" height=\"441\" class=\"alignleft size-full wp-image-452\" srcset=\"https:\/\/www.brucedale.net\/wp-content\/uploads\/2004\/06\/fpso_dalia.png 640w, https:\/\/www.brucedale.net\/wp-content\/uploads\/2004\/06\/fpso_dalia-100x68.png 100w, https:\/\/www.brucedale.net\/wp-content\/uploads\/2004\/06\/fpso_dalia-300x206.png 300w, https:\/\/www.brucedale.net\/wp-content\/uploads\/2004\/06\/fpso_dalia-50x34.png 50w, https:\/\/www.brucedale.net\/wp-content\/uploads\/2004\/06\/fpso_dalia-624x429.png 624w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p>The Dalia FPSO (Floating, Production, Storage and Offloading vessel), shall be built in Goeje, South Korea by Samsung Shipbuilding &amp; Heavy Industries. The FPSO shall\u00a0have hull dimensions of 300m in length, 60m in breadth and 32m of height.<\/p>\n<p>On the hull a 29,400t of topsides shall be constructed.\u00a0The topsides shall have two processing trains to separate out gas and water and to heat the crude. It shall have a water injection capacity of 405,000 bpd, a water treatment capacity of 265,000bpd, a gas compression\u00a0capacity of 8mscf per day and a total storage capacity of 2,000,000 barrels. \u00a0The living quarters shall normally accommodate up to 120 people with the capability to accommodate an additional 70 people during shut-downs.<\/p>\n<p>The structure has a design working life of 20 years and\u00a0will be anchored in 1300 meters of water offshore Angola.\u00a0First oil from Dalia is scheduled for mid 2006.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Dalia FPSO (Floating, Production, Storage and Offloading vessel), shall be built in Goeje, South Korea by Samsung Shipbuilding &amp; Heavy Industries. The FPSO shall\u00a0have hull dimensions of 300m in length, 60m in breadth and 32m of height. On the hull a 29,400t of topsides shall be constructed.\u00a0The topsides shall have two processing trains to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":452,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"aside","meta":[],"categories":[7],"tags":[],"_links":{"self":[{"href":"https:\/\/www.brucedale.net\/index.php?rest_route=\/wp\/v2\/posts\/356"}],"collection":[{"href":"https:\/\/www.brucedale.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.brucedale.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.brucedale.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.brucedale.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=356"}],"version-history":[{"count":9,"href":"https:\/\/www.brucedale.net\/index.php?rest_route=\/wp\/v2\/posts\/356\/revisions"}],"predecessor-version":[{"id":453,"href":"https:\/\/www.brucedale.net\/index.php?rest_route=\/wp\/v2\/posts\/356\/revisions\/453"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.brucedale.net\/index.php?rest_route=\/wp\/v2\/media\/452"}],"wp:attachment":[{"href":"https:\/\/www.brucedale.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=356"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.brucedale.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=356"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.brucedale.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}